View All Projects

Gurugoda Oya MHPP

4.45MW

In late March 2026, Vidullanka PLC acquired a 100% equity stake in Bhoruka Power Lanka (Private) Limited, which owns and operates the Gurugoda Oya Mini Hydro Power Plant. This project serves as Vidullanka’s 12th mini hydro power plant.

View Project Specifications

Project Specifications

Project Capacity 4.45 MWp
Designed Annual Energy 11.6 GWh
River Catchment Gurugoda Oya
Head 66m
Channel Length 1265km
Penstock Length 350m
Plant Factor 30%
Present Status Commissioned Date 01-Nov-2026
Turbine Type 2 Francis Machines @ 2400 kW

Hydro Power Projects