View All ProjectsView Project Specifications
Gurugoda Oya MHPP
4.45MW
In late March 2026, Vidullanka PLC acquired a 100% equity stake in Bhoruka Power Lanka (Private) Limited, which owns and operates the Gurugoda Oya Mini Hydro Power Plant. This project serves as Vidullanka’s 12th mini hydro power plant.
Project Specifications
| Project Capacity | 4.45 MWp |
| Designed Annual Energy | 11.6 GWh |
| River Catchment | Gurugoda Oya |
| Head | 66m |
| Channel Length | 1265km |
| Penstock Length | 350m |
| Plant Factor | 30% |
| Present Status Commissioned Date | 01-Nov-2026 |
| Turbine Type | 2 Francis Machines @ 2400 kW |