- March 26, 2010
- Posted by: admin
- Category: News & Events
No Comments
Vidullanka commissioned its fourth mini hydropower project, “Ganthuna Mini Hydro Power Project” located in Kegalle District. The project is of 1.2 MW capacity and is expected to generate annual energy of 4.12 Gwh. The project was constructed under Gurugoda Hydro (Pvt) Ltd which is jointly held by Vidullanka plc and Hirdaramani (Pvt)Ltd. The construction of the project was carried out by Vidul Construction Limited.